
Start with operations: pedestrian traffic differs from forklift traffic. Identify loads, frequency and impact areas.
Inspect the substrate. Moisture and concrete defects can affect coating adhesion, so colour and price alone are not enough.
Define cleaning and chemical exposure requirements. Review slip resistance with your safety team and request product specifications and a preparation plan.
Compare proposals using an equivalent scope covering preparation, repair, thickness, materials and joints, alongside a maintenance plan.
Discuss your project